Real engineering challenges solved with the CLEAN methodology. Measurable outcomes you can trust.

a leading rendering company
Challenge: Process Buildup, Fan Repairs, & Pressure-Control Issues
Successful Ceramic Media Cleaning
Full bakeout programming installed and tested
High Performance Damper Operation Restored
Supply of new dampers and actuation
Pressure Instruments Replaced and Calibrated
More Efficient Control Implemented
CleanCap restored critical RTO functionality through comprehensive field repairs involving advanced burner troubleshooting, plugged heat recovery media, fan vibration, and pressure-control system restoration, addressing multiple reliability concerns for an industrial processing facility.

Encina Wastewater Authority
Challenge: Silica Buildup & Chronic Shutdowns
20%+
Downtime Reduction
3x Longer
Maintenance Intervals
Significant
Fuel Savings
A 6,400 SCFM RTO serving 400,000+ residents was shutting down every 4-5 weeks due to silica-induced media blinding. CleanCap engineered silica-resistant structured ceramic media, upsized heat-recovery canisters, and Supplemental Fuel Injection (SFI) to restore predictable performance.

Leading RNG Developer
Challenge: Fuel Efficiency & Carbon Intensity
<30 min
Cold Startup
Reduced
Carbon Intensity
Optimized
Heat Recovery
An RNG facility converting landfill gas needed emissions control without excessive fuel use. CleanCap designed an integrated TO + WHRU system with low pressure drop, capturing exhaust heat for glycol heating while minimizing environmental footprint.

WR Grace
Challenge: 30-Day Deployment Window
30 Days
Deployment Time
Compliant
Class 1 Div 2
Turnkey
System Status
WR Grace needed a mothballed oxidizer fully refurbished and operational in 30 days. CleanCap delivered complete modernization including Hastelloy quench tower, new PLC controls, burner system, and Class 1 Div 2 hazardous area compliance.

Automotive Components Manufacturer
Challenge: Energy Waste & Quality Issues
25%
Energy Reduction
Restored
Temp Uniformity
Faster
Warm-up Time
A critical curing oven was consuming excessive energy with ±10-15°F temperature deviations causing scrap. CleanCap's thermal imaging revealed collapsed ceramic fiber and thinned firebrick. Complete multilayer insulation rehabilitation transformed the failing asset.

Fortune 500 Lighting Manufacturer
Challenge: Wastewater Surcharges & Compliance
Reduced
Surcharges
Sellable
Byproduct
Eliminated
ANS Operation
35,000 SCFM scrubbers producing dilute ammonium hydroxide faced costly neutralization and discharge penalties. CleanCap's feasibility study enabled conversion to sulfuric acid injection, creating concentrated ammonium sulfate suitable as fertilizer feedstock.

ET Industrial Manufacturing
Challenge: Thermal Performance Degradation
Minimized
Heat Loss
Safe
Shell Temps
Extended
System Life
A high-temperature processing vessel showed exterior hot spots, performance drift, and rising energy costs. CleanCap's inspection revealed cracked refractory and deteriorated fiber blanket. Full relining with modern materials restored thermal stability and operator safety.