WR Grace needed a mothballed oxidizer fully refurbished and operational in 30 days. CleanCap delivered complete modernization including Hastelloy quench tower, new PLC controls, burner system, and Class 1 Div 2 hazardous area compliance.
30 Days
Deployment Time
Compliant
Class 1 Div 2
Turnkey
System Status
30-Day Deployment Window
Intensive engineering review with parallel mechanical and electrical execution.
WR Grace required a Thermal Oxidizer (TO) system to be fully refurbished, modernized, and integrated into their process within a compressed 30-day deployment window. The project included upgrading a mothballed oxidizer, adding a quench tower, installing new controls, and ensuring Class 1 Div 2 compliance. CleanCap executed a turnkey modernization that delivered rapid installation, full refurbishment, and safe operation in a hazardous environment.
WR Grace is a leading global producer of catalysts and specialty chemicals. Their production processes involve high temperatures, reactive chemicals, and organic vapors requiring thermal destruction. The facility needed a TO capable of destroying high-VOC off-gases while operating dependably in a hazardous area.
The project involved a used TO vessel, an incomplete control panel, and uninstalled valves. It required engineering validation, mechanical reconstruction, electrical installation in a hazardous area, and commissioning. This was a full lifecycle modernization executed under extreme time pressure.
"CleanCap turned a fragmented, non-operational oxidizer into a fully engineered, production-ready emissions control system in record time."